News – 2022-03-07
132 kV from Opstad to Håland – Lyse Lnett
Comrod has been awarded mast delivery for Lyse Lnett’s new 132 kV power line from Opstad to Håland in Time municipality.
![kart-haaland](https://www.comrod.no/wp-content/uploads/kart-haaland.jpg)
The client is Lyse Lnett and the main contractor is Eviny Solutions AS. The power line is approx. 9.1 kilometers long and includes delivery of 56 mast legs to 28 H-masts. The masts will primarily cross cultivated landscape and are therefore high, up to 34 m, and with large diameters up to 1000 mm. This is a significant contract and indicates that Comrod is established as a trusted supplier in the region to its largest grid operatior.